Event Summary
 
  FILE SAVED AS: ONT_9159_20171206_0000.htm  
 
 Incident:   ONT_9159_20171206_0000   Date:  12/05/2017 (CST)   Reliability Coordinator:  ONT 
 Initial Conditions:   N/A
 Flowgate:   9159 - ONTARIO-ITC   Rating:  0   LODF:   N/A
 TLR Direction:   Normal 
 Effective StartTime:   12/06/2017 00:00 (CST)   Effective EndTime:  12/06/2017 14:40 (CST)   TLR Duration:  14 Hours and 40 Minutes
 
TLR Actions
 Confirm 
 Time 
 Level   Effective 
 Hour 
 Priority   Schedule   NNL Relief   Market Relief   Flow   Cont. 
 Flow 
 TLR Action Comments 
 Total Tags 
 Cut / Hold 
 IDC Cut   RC Cut 
 Acknowledge 
 Hold   CA   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Type   Mkt   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Current   Post 
 Cont. 
 MW   Relief   MW   Relief   MW   Relief 
Dec 05 
23:29 (CST) 
 TLR 3A   NEXT 
 6-NN 
 Total 
 4 / 8 
 4  /  8 
 731 
 731 
 167.6 
 167.6 
 731 
 731 
 167.6 
 167.6 
 1002 
 1002 
 233.0 
 233.0 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 1400   N/A  N/A LEC at 500 MW CCW, with phase shifters on top tap.
Dec 06 
00:27 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 1100   N/A  N/A LEC at 200 MW CCW, with phase shifters on top tap.
Dec 06 
01:27 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 970   N/A  N/A LEC at 71 MW CCW, with phase shifters on top tap.
Dec 06 
02:27 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 970   N/A  N/A LEC at 70 MW CCW, with phase shifters on top tap.
Dec 06 
03:26 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 860   N/A  N/A LEC at 40 MW CW. Phase shifter on top tap.
Dec 06 
04:27 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 670   N/A  N/A LEC at 230 MW CW. Phase shifters on top tap.
Dec 06 
05:27 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 801   N/A  N/A A LEC at 140 MW CW. Phase shifters on top tap.
Dec 06 
06:28 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 573   N/A  N/A A LEC at 240 MW CW. Phase shifters on top tap.
Dec 06 
07:26 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 610   N/A  N/A A LEC at 130 MW CW. Phase shifters on top tap.
Dec 06 
08:28 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 536   N/A  N/A A LEC at 30 MW CW. Phase shifters on top tap.
Dec 06 
09:28 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 540   N/A  N/A A LEC at 30 MW CW. Phase shifters on top tap.
Dec 06 
10:26 (CST) 
 TLR 3A   NEXT 
 7-F 
 Total 
 0 / 1 
 0  /  1 
 0 
 0 
 0.0 
 0.0 
 0 
 0 
 0.0 
 0.0 
 50 
 50 
 13.7 
 13.7 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 440   N/A  N/A A LEC at 140 MW CW. Phase shifters on top tap.
Dec 06 
11:26 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 400   N/A  N/A A LEC at 240 MW CW. Phase shifters on top tap.
Dec 06 
12:27 (CST) 
 TLR 3A   NEXT   NONE   NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 405   N/A  N/A A LEC at 130 MW CW. Phase shifters on top tap.
Dec 06 
13:30 (CST) 
 TLR 3A   NEXT 
 7-F 
 Total 
 0 / 3 
 0  /  3 
 0 
 0 
 0.0 
 0.0 
 0 
 0 
 0.0 
 0.0 
 107 
 107 
 45.2 
 45.2 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 263   N/A  N/A A LEC at 200 MW CW. Phase shifters on top tap.
Dec 06 
14:16 (CST) 
 TLR 1   CURRENT   NONE   NONE   NONE   0   N/A  N/A N/A
Dec 06 
14:18 (CST) 
 TLR 0   CURRENT   NONE   NONE   NONE   0   N/A  N/A N/A
 
TLR Schedule Totals
 Priority   Schedule 
 Total Tags 
 Cut / Hold 
 IDC Cut 
 MW 
 RC Cut 
 Acknowledge 
 MW 
 Hold 
 MW 
 0   0   0   0   0 
 1   0   0   0   0 
 2   0   0   0   0 
 3   0   0   0   0 
 4   0   0   0   0 
 5   0   0   0   0 
 6   4   731   731   1002 
 7   0   0   0   157 
 Total   4   731   731   1159 
 
TLR Market Flow Totals
 Market   Type   Market Relief 
 IDC 
 MW 
 RC 
 Ackn 
 MW 
 MISO   ED-2   0.0   0.0 
 ED-6   0.0   0.0 
 FIRM-7   0.0   0.0 
 Total MISO   0.0   0.0 
 PJM   ED-2   0.0   0.0 
 ED-6   0.0   0.0 
 FIRM-7   0.0   0.0 
 Total for PJM   0.0   0.0 